Execution works for investment objectives (Danube shore protection, point for Danube crossing, border crossing point, connection road to DN57)
The works foreseen are as follows: Danube shore consolidation in the shoulder area, shore protection works, mounting a gangway to provide access between the pontoon and the shore and backwards, mounting a metal canopy over the surfaces where the vehicle control will take place, arranging a platform with utilities (water, sewerage, electricity — needed to unfold the activity of the border control, road construction to connect the location with the national road DN 57. — Detailed information are available in the technical design.
Termen limită
Termenul de primire a ofertelor a fost de 2015-04-27.
Achiziția publică a fost publicată pe 2015-02-19.