Execution works for investment project (Danube shore protection, point for Danube crossing point, connection road to DN57)
The works brief description are as follows: Danube shore consolidation in the shoulder area, shore protection works, mounting a gangway to provide access between the pontoon and the shore and backwards, mounting a metal canopy over the surfaces where the vehicle control will take place, arranging a platform with utilities (water, sewerage, electricity — needed to unfold the activity of the border control, road construction to connect the location with the national road DN 57) — detailed information are available in the technical design uploaded at
www.primaria-moldova-noua.ro
Termen limită
Termenul de primire a ofertelor a fost de 2015-09-10.
Achiziția publică a fost publicată pe 2015-07-07.
Cine?
Ce?
Unde?
Istoricul achizițiilor
Data |
Document |
2015-07-07
|
Anunţ de participare
|
2015-07-10
|
Informaţii suplimentare
|
2015-09-16
|
Informaţii suplimentare
|