Execution works for investment project (Danube shore protection, point for Danube crossing point, connection road to DN 57)
Danube shore consolidation in the shoulder area, shore protection works, mounting a gangway to provide access between the pontoon and the shore and backwards, mounting a metal canopy over the surfaces where the vehicle control will take place, arranging a platform with utilities (water, sewerage, electricity — needed to unfold the activity of the border control, road construction to connect the location with the national road DN 57).
Termen limită
Termenul de primire a ofertelor a fost de 2016-09-19.
Achiziția publică a fost publicată pe 2016-07-12.